Recent Solar Projects

Recent off-grid & solar projects

The Dam Restaurant - Denmark

This premium commercial off grid system was designed to upgrade the customers capacity to three phase and provide renewable energy to the restaurant. The system has been designed to convert grid supplied 480V Split Phase to three phase, all using renewable energy. The system is upgradable in all solar/storage and power delivery fronts if the customers consumption increases.

Results

Power Delivery = 22.5 kW Continuous / 36 kW 30 minutes THREE PHASE

Handasyde Strawberries - Albany

This premium commercial off grid system is designed to run consumer loads without costly network upgrades and/or running expensive diesel generators.
The system is upgradable in all solar/storage and power delivery fronts if the customer needs to increase production.

Results

Power Delivery = 60 kW Continuous / 90 kW 30 minutes THREE PHASE

Tekag - Koorda

This premium Agricultural off grid system was designed to upgrade the customers capacity when the network provider could not. The system has been designed to charge 2 x Electric Vehicles, run induction cooktops, air conditioning, house and workshop all using renewable energy. The system is upgradable in all solar/storage and power delivery fronts if the customers consumption increases.

Results

Power Delivery = 15 kW Continuous / 24 kW 30 minutes SINGLE PHASE

Small Farm – Gingin

This premium agricultural off grid system was designed run two houses and a workshop. The system was cheaper to install than connecting grid power to the property and ensures no ongoing power bills. The system is upgradable in all solar/storage and power delivery fronts if the customers consumption increases.

Results

Power Delivery = 7.5 kW Continuous / 12 kW 30 minutes SINGLE PHASE

Cheela Plains Station Stay

Cheela Plains were running a 90kVA generator costings circa $100,000 a year running costs. Statewide Power designed, supplied and installed a system that included 54kW of solar panels and 60kWh of batteries. Saving $55,000 or more of diesel per annum | ROI of 3.5 – 4 years | Warranty of 10 years on system and expected life of 17-20 years.

Results

$750,000 of money saved over 20 years.

Electrical Refit for Bruce Rock Accommodation

The 48 person, ex mining camp at Bruce Rock, WA now serves as temporary accommodation for the workers of Bruce Rock Engineering at their head office in Bruce Rock. It consists of 15 cabins, a kitchen and a recreation facility.

Results

Reverse cycle, split system air conditioners were installed in all rooms.

GK Fisher Farms goes Off-Grid

Farming is a tough enough business without the added financial pressure of ever-increasing power bills. GK Fisher Farms in Corrigin had had enough of their profits being cropped and harvested by the power company. It was time to go off-grid.

Results

GK Fisher Farms is reaping a $4k/year saving in their energy costs.

Aquaculture Solar and Pumping System

100kw solar and pumping system | Local marron farmers, Capel Marron Farm had an enormous energy bill from their old 3 phase pumps used to deliver water from the Capel river to the farm’s marron ponds.Essential to the survival of their marron and their business, the spiralling energy bills caused by these pumps connected to the grid were eating away at their profits.

Results

Savings of $25k-$30k per annum on energy costs

Get a quote today

Get ready for the future. Contact us today for a free, no obligation quote on installing an off-grid solar system on your property.

Get a quote today

Get ready for the future. Contact us today for a free, no obligation quote on installing an off-grid solar system on your property.

Scroll to Top