Case Study: Electrical Refit for Bruce Rock Engineering
The 48 person, ex mining camp at Bruce Rock, WA now serves as temporary accommodation for the workers of Bruce Rock Engineering at their head office in Bruce Rock. It consists of 15 cabins, a kitchen and a recreation facility.
Wanting to provide the best comforts to their workers staying at the camp, Bruce Rock Engineering contracted Statewide Power to carry out a complete overhaul of the 180-amp electrical system from the ground up.
Statewide Power, chosen for our experience and proven capabilities with these types of projects, supplied and installed an entirely new electrical system from a new site mains switch board, right through to upgrading the smoke alarms
Every building received switchboard upgrades, new smoke alarms, LED lighting and roof-mounted solar panels to keep energy costs to a minimum.
Learn more about our commercial-grade off-grid solar backup systems.
Results
- Panasonic, reverse cycle, split system air conditioners were installed to all rooms, ensuring everyone at Bruce Rock Engineering is kept comfortable and happy.
Panasonic, reverse cycle, split system air conditioners were installed to all rooms, ensuring everyone at Bruce Rock Engineering is kept comfortable and happy.
Get a quote today
Get ready for the future. Contact us today for a free, no obligation quote on installing an off-grid solar system on your property.